Vous devez activer les cookies pour accéder à ce site.
Automation
Synchronise information within CMap
Return to App MarketplaceThe CMap Connector integrates material tracking and procurement workflows with Newforma Project Center’s submittal management and project documentation capabilities, enabling construction teams to synchronize material specifications, procurement status, and delivery tracking between CMap’s material management platform and Project Center’s construction administration workflows. This integration eliminates the manual overhead of maintaining parallel material records across systems, allowing teams to coordinate submittal requirements with material procurement schedules while maintaining synchronized material specifications, vendor information, and delivery status across both platforms—streamlining the connection between design submittals and actual material procurement for improved project delivery.
Managing material tracking across disconnected CMap and Project Center systems traditionally requires project teams to manually correlate submittal specifications with material procurement records, duplicate material information across platforms, and maintain separate tracking for design approval status versus procurement and delivery status. When submittal requirements live in Project Center but material procurement happens in CMap, teams face coordination gaps as specification changes don’t automatically update procurement records, tracking inefficiency where users must check both systems to understand complete material status from design through delivery, and workflow disconnection where submittal approval doesn’t trigger procurement actions or delivery schedule updates. Project coordinators spend hours cross-referencing submittal numbers with material tracking IDs, manually updating procurement status based on submittal approvals, and reconciling material specifications between systems—creating administrative burden that delays procurement decisions and risks specification mismatches between approved submittals and ordered materials.
The CMap Connector eliminates this disconnect by establishing bidirectional synchronization between Project Center submittal workflows and CMap material tracking records, automatically transferring material specifications, submittal approval status, vendor information, and delivery schedules between both platforms. The connector monitors Project Center submittal workflows for material-related items, automatically creating or updating corresponding CMap material records with submittal specifications, approved vendor information, and design approval status—while simultaneously updating Project Center with CMap procurement status, delivery schedules, and material receipt confirmation. Users work within their specialized systems—design teams manage submittals through Project Center’s familiar workflow interface while procurement teams track materials through CMap’s dedicated material management platform—with the connector maintaining synchronization automatically. This integrated approach enables teams to coordinate design approval timing with procurement schedules, ensure that ordered materials match approved submittal specifications, and maintain unified visibility of material status from initial submittal through final delivery and installation.
Approved submittal specifications automatically transfer to CMap without manual data entry or transcription errors.
Synchronized records ensure ordered materials match design-approved specifications from Project Center submittals
Procurement teams view current submittal status in CMap to optimize material ordering timing and avoid premature purchases.
Connected records support warranty management and facility operations with complete material specification and procurement history.
Synchronize Material Specifications Between Submittal and Procurement Systems
The connector automatically transfers material specifications from Project Center submittal workflows into CMap material tracking records, ensuring that procurement teams work from current approved specifications without manual data entry or specification mismatches.
Enable Coordinated Procurement Timing Through Submittal Status Visibility
The connector provides CMap users with visibility into Project Center submittal approval status, enabling procurement teams to coordinate material ordering with design approval timing and avoid premature procurement of materials pending specification review.
Maintain Material Tracking Throughout Complete Project Lifecycle
The integration establishes continuous material tracking from initial submittal through final installation and closeout, linking design specifications, procurement records, delivery confirmation, and installation verification within connected Project Center and CMap systems.