Vous devez activer les cookies pour accéder à ce site.

Get a Demo Careers Contact us AEC Glossary

Connector

NBS

The NBS Connector integrates NBS with Newforma Project Center to synchronize project specifications and streamline construction administration workflows.

Return to App Marketplace

Specification Management Integration Through Project Center

The NBS Connector integrates specification authoring and management with Newforma Project Center’s construction administration and document workflows, enabling design teams to synchronize project specifications between NBS specification platforms and Project Center’s document management system. This integration eliminates the manual overhead of exporting specifications from NBS and importing them into Project Center, allowing teams to maintain current specification documents within Project Center’s searchable archive while coordinating specification sections with submittal requirements, RFI responses, and construction administration workflows—ensuring that project teams always work from approved specification content throughout design and construction phases.

Managing project specifications across disconnected NBS authoring tools and Project Center document management systems traditionally requires specification writers to manually export completed specification sections, convert them to distribution formats, and upload them to Project Center—creating version control challenges and documentation gaps. When specifications develop in NBS but construction teams reference them through Project Center, teams face specification currency issues as NBS updates don’t automatically reflect in Project Center document libraries, workflow disconnection where submittal requirements don’t link to corresponding specification sections, and search inefficiency when specification content remains external to Project Center’s indexed document search. Specification coordinators spend hours managing specification export cycles, updating Project Center with revised sections, and manually correlating specification references in RFIs and submittals with actual specification documents—creating administrative burden that delays specification distribution and risks construction teams working from outdated specification content.

The NBS Connector eliminates this disconnect by establishing automated synchronization between NBS specification platforms and Project Center’s document management system, automatically transferring completed specification sections from NBS into Project Center as searchable, properly formatted documents with full metadata and section organization. The connector monitors NBS projects for specification updates and completion milestones, automatically exporting finished sections and uploading them to designated Project Center folders with proper naming conventions, version control, and specification metadata. Users continue working within their specialized systems—specification writers author content in NBS while construction teams access specifications through Project Center’s familiar document interface—with the connector maintaining synchronization automatically.

Benefits

Eliminate Manual Specification Export and Upload Operations

Completed NBS specifications automatically transfer to Project Center without coordinator intervention or manual file handling.

Ensure Construction Teams Access Current Specification Content

Automatic synchronization eliminates delays between specification updates and Project Center document availability.

Enable Unified Document Search Including Specification Content

Specifications become searchable through Project Center alongside drawings and other documents without separate NBS searches

Maintain Specification Version History Across Both Platforms

Coordinated version control allows teams to identify current content while preserving access to historical specification revisions.

Preserve Specification Authoring in Specialized NBS Platform

Specification writers continue using NBS tools while construction teams access content through familiar Project Center interface.

Features

Automatically Synchronize NBS Specifications to Project Center

The connector automatically transfers completed specification sections from NBS into Project Center's document management system, eliminating manual export and upload operations while ensuring construction teams access current specification content.

Maintain Specification Version Control Across Both Platforms

The connector preserves specification version history and revision tracking across both NBS and Project Center systems, ensuring teams can identify current specification content while maintaining access to previous versions for reference or comparison.

Enable Specification Search Through Project Center Document Index

Specifications synchronized from NBS become fully searchable through Project Center's document search capabilities, enabling construction teams to locate specification requirements through the same search interface used for drawings, submittals, and other project documents.

Support Specification-Linked Submittal and RFI Workflows

The integration enables direct linking between Project Center submittal workflows and source specification sections synchronized from NBS, allowing submittal reviewers to reference exact specification requirements while reviewing material submissions and enabling clear traceability from specification content to submittal compliance.